MAN 4504 Project 2
Guidelines:
Your paper should include the
following:
Page 1Title of
paperStudent NameStudent
course number and course nameSemester and
yearName of
University- correctly spelledName of
Professor – correctly spelledVisible
digital photo of yourself

2. Page 2
Table of contents

3. Pages 3 –
5 Your answers to Problem Assigned ( it is up to you on how many pages you
place your answers)

Paper should be

Double
spaced,Fonts: Times
Roman or ArielFont size:
12Font color :
blackMargins
should be 1″ either sideSpell
checkedMS Word- Any
other applications should be from the MS familyCBA does not
support Visio or WordPerfectEmailed by
class time Project 2 must be
presented in ONE fileand saved as
“yournameproject 2.doc”Project 2 must have a color
digital and visible photoof
yourself

Project 2 Problem:
A partially
solved PERT problem is detailed in the table below. Times are given in
weeks. You need to show your work!

Activity

Preceding

Optimistic
Time

Probable
Time

Pessimistic
Time

Expected
Time

Variance

A

7

9

14

1.361

B

A

2

2

8

1.00

C

A

8

12

16

1.778

D

A

3

5

10

1.361

E

B

4

6

8

0.444

F

B

6

8

10

0.444

G

C, F

2

3

4

0.111

H

D

2

2

8

1.000

I

H

6

8

16

2.778

J

G, I

4

6

14

2.778

K

E, J

2

2

5

0.250

a. Calculate the expected time for each
activity. Enter these values in the appropriate column in the table above.
b. Which
activities form the critical path?
c. What
is the estimated time of the critical path?
d. What
are the project variance and the project standard deviation?