Please consider the numbers below. Both data sets were captured during a single week of production. | |||||||||||||||||||||||||||
Data Set One was taken first, but it didn’t show what the manager wanted, so she told her production supervisor to try again. | |||||||||||||||||||||||||||
The manager has been asked to “demonstrate process capability.” (In this company, 4-sigma quality is the expected standard.) | |||||||||||||||||||||||||||
Data Set Two was from the same process, without any changes to the process, but as you can see, the sample size and number of samples was changed. | |||||||||||||||||||||||||||
Please draw Mean and Range control charts, calculate Capability, and comment on what action this manager might want to take. | |||||||||||||||||||||||||||
HINT #1: To calculate capability, you need the s of the raw data set, preferably estimated using large samples. You don’t have the raw data set, and the sample sizes are not as large as you might want. | |||||||||||||||||||||||||||
But you can estimate the s by using the known fact that A2*R_bar is approximately equal to 3s/sqrt(n) | |||||||||||||||||||||||||||
Data Set One shows the summary results from 18 different samples, with n=20 measurements in each sample. | |||||||||||||||||||||||||||
Data Set Two shows the summary results from 27 different samples, with n=5 measurements in each sample. | |||||||||||||||||||||||||||
HINT #2: Don’t be fooled, there’s something odd about this data. One data set indicates “process capable”, while the other does not, even though the data comes from the exact same process. | |||||||||||||||||||||||||||
What’s going on? The results of this test are being manipulated somehow. What is it? | |||||||||||||||||||||||||||
HINT #3: You will get nowhere on this assignment if you forget the difference between “control” and “capability”. I have asked you to make control charts, and also to calculate process capability. | |||||||||||||||||||||||||||
The “control” part of the assignment is completely unrelated to the “capability” part of this assignment. Learn the difference. | |||||||||||||||||||||||||||
Summary of Data Set One | Summary of Data Set Two | Target Spec = 45.00 | |||||||||||||||||||||||||
Sample | Mean | Range | Sample | Mean | Range | Tolerance = +0.75 |
|
||||||||||||||||||||
1 | 45.01 | 0.85 | 1 | 44.96 | 0.42 | ||||||||||||||||||||||
2 | 44.99 | 0.89 | 2 | 44.98 | 0.39 | ||||||||||||||||||||||
3 | 45.02 | 0.86 | 3 | 44.96 | 0.41 | ||||||||||||||||||||||
4 | 45.00 | 0.91 | 4 | 44.97 | 0.37 | ||||||||||||||||||||||
5 | 45.04 | 0.87 | 5 | 45.02 | 0.39 | ||||||||||||||||||||||
6 | 44.98 | 0.9 | 6 | 45.03 | 0.40 | ||||||||||||||||||||||
7 | 44.91 | 0.86 | 7 | 45.04 | 0.39 | ||||||||||||||||||||||
8 | 45.04 | 0.89 | 8 | 45.02 | 0.42 | ||||||||||||||||||||||
9 | 45.00 | 0.85 | 9 | 45.08 | 0.38 | ||||||||||||||||||||||
10 | 44.97 | 0.91 | 10 | 45.12 | 0.40 | ||||||||||||||||||||||
11 | 45.11 | 0.84 | 11 | 45.07 | 0.41 | ||||||||||||||||||||||
12 | 44.96 | 0.87 | 12 | 45.02 | 0.38 | ||||||||||||||||||||||
13 | 45.00 | 0.86 | 13 | 45.01 | 0.41 | ||||||||||||||||||||||
14 | 44.92 | 0.89 | 14 | 44.98 | 0.40 | ||||||||||||||||||||||
15 | 45.06 | 0.87 | 15 | 45.00 | 0.39 | ||||||||||||||||||||||
16 | 44.94 | 0.86 | 16 | 44.95 | 0.41 | ||||||||||||||||||||||
17 | 45.00 | 0.85 | 17 | 44.94 | 0.43 | ||||||||||||||||||||||
18 | 45.03 | 0.88 | 18 | 44.94 | 0.40 | ||||||||||||||||||||||
19 | 44.87 | 0.38 | |||||||||||||||||||||||||
20 | 44.95 | 0.41 | |||||||||||||||||||||||||
21 | 44.93 | 0.39 | |||||||||||||||||||||||||
22 | 44.96 | 0.41 | |||||||||||||||||||||||||
23 | 44.99 | 0.40 | |||||||||||||||||||||||||
24 | 45.00 | 0.44 | |||||||||||||||||||||||||
25 | 45.03 | 0.42 | |||||||||||||||||||||||||
26 | 45.04 | 0.38 | |||||||||||||||||||||||||
27 | 45.03 | 0.40 |