BUS 519 Week
6 Assignment 3 Risk Workshop and Risk Register
1. Identify the required pre-workshop activities.
2. Prepare a risk workshop agenda based
on Figure B-8, Sample Agenda for a First Risk Assessment / Two â Day Risk
Workshop (Appendix B of the Hillson and Simon text). Include suggested
time intervals for each activity and justify why each agenda item is relevant
for this case.
3. Determine the top five (5) threats in a
risk register following Figure B-11, Sample Simplified Risk Register
Format (Appendix B of the Hillson and Simon text). Include information from the
case for each threat.
4. Justify the assignment of probability and
impacts for each threat identified in criterion number 3 of this assignment.
5. Document the top three (3) opportunities
in a risk register following Figure B-11, Sample Simplified Risk Register
Format (Appendix B of the Hillson and Simon text). Include information from the
case for each opportunity.
6. Justify the assignment of probability and
impacts for each opportunity identified in criterion number 5 of this
assignment.
Use at least two (2)
quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as
quality resources.
Your assignment must follow these formatting requirements:
Be typed, double
spaced, using Times New Roman font (size 12), with one-inch margins on all
sides.
Include a cover page
containing the title of the assignment, the studentâs name, the
professorâs name, the course title, and the date. The cover page and the
reference page are not included in the required assignment page length.