Warning: include(/home/smartonl/royalcustomessays.com/wp-content/advanced-cache.php): failed to open stream: No such file or directory in /home/smartonl/royalcustomessays.com/wp-settings.php on line 95

Warning: include(): Failed opening '/home/smartonl/royalcustomessays.com/wp-content/advanced-cache.php' for inclusion (include_path='.:/opt/alt/php56/usr/share/pear:/opt/alt/php56/usr/share/php') in /home/smartonl/royalcustomessays.com/wp-settings.php on line 95
THEORIES OF PERSONALITY – RoyalCustomEssays

THEORIES OF PERSONALITY

Customer Focus Principles
September 11, 2018
Cochlear Implant
September 11, 2018

 

Post has three assignments

Read Text: Experience Psychology (2nd.). King, L.A. New York, NY: McGraw-Hill, 2013. ISBN 978-0-07-803534-0

Provide pages number in bold where you find the answers. I will review your answers based on your page numbers and my answer sheet before assigning a grade to your study assignment.
HINT: Your answers will be no longer than one to three words.

2: ERD, Activity and Class Diagrams Design
In this assignment, Individual group members are required to design an ERD diagram(s) to your use cases from the previous assignment, and the necessary activity diagram(s). Then:

? As a group merge the individual ERDs from each Use Case to produce a system ERD.
? Check the relationships and attributes, and ensure that each entity is in 3NF.
? Map the System ERDs into related class diagrams. The class diagram need to be detailed
enough that can directly mapped into executable high level programming language such
as Java or Smalltalk.
? As a group, make a decision on the system activity diagram(s) to show the action and events as they occur in the system
? Group members are then required to write one full specifications report for this
assignment. The report should include:
i. System ERD
ii. Commentary on the decisions made whilst merging the ERDs
iii. Pick the best Class Diagrams with consensus and reason the selection
iv. A data dictionary describing each table, and each attribute
v. The system activity diagram
vi. A summary of what you have learned from this process

Diagrams Design

Place Order